GRAND OPENING OF THE LEKENIK – SISAK SECTION ON THE A11 ZAGREB-SISAK MOTORWAY
29 Oct 2024
Works on the 10.86-kilometer-long section began in 2022 and included preparatory and earthworks, pavement construction and drainage. The section included six road crossings with overpasses and two bridges, electrical works and traffic equipment and signaling.
The last section of the A11 Lekenik – Sisak should significantly improve connectivity and infrastructure in Sisak-Moslavina County and bring new opportunities to the region.
In addition to its importance for the region, the project also has a CSR dimension because recycled asphalt was used.
Prime Minister Andrej Plenković, who attended the opening ceremony, congratulated the investor Croatian Motorways Ltd. and the contractors, and Colas proudly points out that the road has been opened, which brings new opportunities for the local population.
Otvorenje A11 - objava za medije
(pdf 320.75 KB)
Otvorenje A11 - objava za medije
(pdf 320.75 KB)